Funding:
|
|
Recommendation
|
Approving Change Order EC-018 with Allegheny City Electric to remove an existing electrical panel during Phase 5 of the project that was not identified on the previous renovation documents from June 2000. A temporary panel was required to be installed to provide power to existing circuits feeding AHU-2 and phase 7 classrooms. Total Cost of $9,923.11. |
|
|
Approvals:
|
Recommended By: |
Signed By: |
|
Lisa Wilson - Secretary - Superintendent |
|
Signed By: |
|
Jerri Lynn Lippert - Superintendent |
|
|
|
|
|
|
|