13.2 Change Order GC-047  
:
 
Enclosure:
 
File Attachment:
 
Summary:
 
Funding:
 
Recommendation
Approving Change Order GC-047 with the Hudson Group for costs associated with miscellaneous structural steel revisions at A101C column line 8 and slab floor bearing above the boiler room. Total Cost of $3,030.00.  